Together We Built This.
Waterworks Connector Trail
This project for Phase 2 of the Museum Trail consisted of the construction of a 1,700’ asphalt biking trail and serves as an integral portion of a historic trail that offers an uninterrupted connection from downtown Jackson to the Lefleur Museum district.
-
Jackson, MS
-
1,700 sq ft
X_712.1
Construction
Documents
Documents
Waterworks Connector Trail
Jackson, MS- Project No.
- Date
- Drawna.mc.
- Checkeda.mc.
- Revisions
Planting Sheet Key
Y_131.1
X_712.0