Together We Built This.
Dorm and Lobby Renovation
This project for Mississippi College included the renovation of lobbies and common areas in several on campus dormitories. All work was started and completed in 38 days, during a holiday break between semesters.
-
Clinton, MS
-
Education
-
24,000 sq ft
X_712.1
Construction
Documents
Documents
Mississippi College Dorm & Lobby Renovation
Clinton, MS- Project No.00000 (A-0000)
- DateSeptember 1 2022
- Drawna.mc.
- Checkeda.mc.
- Revisions
Planting Sheet Key
Y_131.1
X_712.0